Friday, July 26, 2013

Studio Painting Part Two

After three days of painting and moving and putting back, taking breaks to go to the dentist to have my partials adjusted.  PS still needs adjusting but at least not rubbing a sore right now.
The room is done!  The pictures are going clockwise around the room.  I'm starting to the right of the entryway to the upstairs mobile home and going around.  First is my baby wood stove, the French doors that lead out to the back patio and the hot tub, then my counter and cupboards where a lot of my stuff is stored, then along the back wall is the TV and the long frame is my quilt frame that holds my ironing board when there is not a quilt loaded, then the third wall that has three cupboards. 
The first cupboard is my husbands and I have custody of the other two.  Then is the other side door that has a walkway that leads to the driveway which is where my paint students come in. 
After the door is the computer area, filing cabinet, and beer fridge.  Yes, beer fridge, :)  we do have food in the top and the bottom has two taps and holds sodas.  On tap right now are: Raspberry Amber and Chocolate Raspberry Stout.  Now for the pictures.




the light cord still needs stapled up :)



 
I want to rip out the carpet which has been there for 15 years and put in tile but that will have to wait for a while.  Too many projects going at the time...

No comments:

Post a Comment